2 INFORMATION SECURITY RISK MANAGEMENT
Information security risk management is a
core responsibility of security leaders, equipping them with processes to
identify, assess, and mitigate risks that threaten an organization’s
information assets. Effective risk management ensures that limited resources
(time, budget, personnel) are prioritized toward the most significant security
risks. In fact, maintaining an organization’s risk management program is one of
the four primary domains of the Certified Information Security Manager (CISM)
exam, reflecting its importance to the security manager’s role. This chapter
provides a comprehensive overview of risk management concepts and practices,
including risk assessment techniques, risk treatment options, security control
categories, and frameworks (with a focus on NIST), as well as tools for risk
visibility like risk registers. The goal is to build a solid understanding of
how to manage cybersecurity risks in an enterprise environment, with special
attention to exam-relevant formulas and concepts that CISM candidates
should master.
Before diving into process and methodology,
it is important to establish a clear vocabulary for discussing risk. In
everyday conversation people often use terms like threat, vulnerability,
and risk interchangeably, but in information security they have distinct
meanings:
·
Threat: A threat is any external event or force that could potentially harm
an information system. Threats can be natural (e.g. hurricanes,
earthquakes, floods) or man-made (e.g. hackers, malware, terrorism). An
easy way to think of a threat is as what we’re trying to protect against
– it is a danger that exists independently of the organization’s control. For
example, an earthquake or a hacker exists whether or not your organization is
present; you generally cannot eliminate the existence of threats. A related term
often used is threat vector, which describes the method or path a threat
actor uses to reach a target (for instance, phishing emails, an exploit kit, or
even physical break-in are all threat vectors).
·
Vulnerability: A vulnerability is a weakness or gap in our protections that could
be exploited by a threat. In other words, vulnerabilities are internal factors
– deficiencies in security controls, configurations, or processes – that leave
an asset exposed to harm. Examples include an unpatched software flaw, an open
network port, weak passwords, or an unlocked door. Unlike threats,
organizations do have control over their vulnerabilities; a major part
of security management is finding and fixing these weaknesses.
·
Risk: Risk arises only when a threat and a vulnerability are
present simultaneously. A risk is the potential for loss or damage when a
threat exploits a vulnerability. If either the threat or the vulnerability is absent, there is no
risk (or effectively zero risk for that scenario). For example,
if you have a server that is missing critical patches (vulnerability)
and there are hackers actively seeking to exploit that software flaw (threat),
then your organization faces a risk of compromise. Conversely, if your data
center is inland and far from any coast, then even if the building construction
is not hurricane-resistant (vulnerability), the risk of hurricane damage
is negligible because the threat of a hurricane in that region is
essentially non-existent. Likewise, you might have an external threat like a
new computer virus in the wild, but if your systems are fully patched and have
up-to-date antivirus (no vulnerability), that specific risk is
mitigated. In short, risk is the possibility of harm materializing when
a matching threat and vulnerability meet.

Figure: The image shows how threats,
vulnerabilities, and risks are linked. A threat is a potential cause of
harm, such as a cyberattack. A vulnerability is a weakness in a system
that can be exploited by that threat. When a threat successfully exploits a
vulnerability, it creates a risk — the possibility of loss or damage.
Understanding this relationship is essential for assessing and managing
cybersecurity risks effectively.
Exam Tip: Remember the simple relationship: Risk = Threat × Vulnerability.
CISM questions may test the understanding that both a threat and a
vulnerability must be present for a risk to exist. If either factor is zero
(absent), the resulting risk is zero. Also know the term exposure – when
we speak of being "exposed" to a risk, we mean a threat has a path to
exploit a vulnerability.
Once risks are identified, they are
evaluated on two dimensions: likelihood and impact. The likelihood
(or probability) of a risk event is the chance that the threat will exploit the
vulnerability and materialize into an incident. For example, consider the risk
of an earthquake affecting two different offices: one in California and one in
Wisconsin. Historically, California experiences frequent earthquakes, whereas
Wisconsin has had virtually none. Thus, the likelihood of earthquake damage is high
in California and extremely low in Wisconsin. A risk manager in California
must account for earthquakes as a realistic risk, whereas in Wisconsin that
risk might be so unlikely that it can be deprioritized. The impact
of a risk is the magnitude of damage or loss if the risk event occurs. For
instance, an earthquake could cause catastrophic damage to a data center (high
impact), while a minor rainstorm might cause negligible damage (low impact).
Impact can be measured in various terms – commonly financial cost, but also
reputational damage, regulatory penalties, safety consequences, etc., depending
on the scenario.
Risk assessment is the process of analyzing
identified risks by estimating their likelihood and impact, and then
prioritizing them. The outcome of risk assessment is typically a ranked list of
risks – so that management can focus on the most probable and harmful events
first. There are two broad approaches to risk assessment: qualitative
and quantitative. We will explore each in detail.
Qualitative risk assessment uses subjective
ratings to evaluate risk likelihood and impact, often expressed in relative
terms such as “Low,” “Medium,” or “High.” Rather than assigning numeric values,
qualitative methods rely on expert judgment, experience, and categorical scales
to prioritize risks. This approach is common when exact data is scarce or when
an organization wants a high-level overview of its risk landscape.
A popular tool in qualitative analysis is
the risk matrix (also known as a heat map). This is a grid that
plots likelihood on one axis and impact on the other, classifying risks
into categories like low, moderate, or high based on where they fall in the
grid. For example, an event that is assessed as having a High likelihood
and High impact would be rated as a High Risk overall, demanding
urgent attention. On the other hand, a risk with Medium likelihood but Low
impact might be categorized as Low Risk overall, and thus not a top
priority.

Figure: An example of a qualitative risk
heat map. Likelihood is on the vertical axis (from Low at the bottom to
High at the top), and Impact on the horizontal axis (from Low on the left to
High on the right). Each cell’s color indicates the risk level – for instance,
green for low risk, yellow for medium, and red for high. In this illustration,
only combinations of high impact with medium or high likelihood yield High Risk
(red). Notice that if either impact or likelihood is low (e.g. the bottom row,
or the leftmost column), the overall risk is rated Low (green) despite the
other factor.
Using such a matrix, an assessor can take
each identified risk and assign it a qualitative likelihood rating and impact
rating. These ratings are then combined (by rules defined in the matrix) to
produce an overall risk rating. The matrix provides a visual cue to
decision-makers: the clustering of risks in the red (high) zone versus yellow
or green zones helps leadership immediately see which risks are most critical.
Qualitative rankings are easy for stakeholders to understand and are very
useful in facilitating discussions and initial prioritization.
However, qualitative assessments have
limitations. They are inherently subjective – one expert’s
"Medium" impact could be another’s "High." To improve
consistency, organizations define risk rating criteria in their risk management
policies. For example, impact criteria might be defined such that High
impact means “financial loss over $1M or regulatory fines, or lives at
stake,” Medium might mean “disruption of a major system or moderate
financial loss,” and Low means “minor inconvenience or low cost.” Similarly,
likelihood criteria might be tied to frequencies (e.g., High likelihood
= expected to occur at least once a year, Medium = once every few years, Low =
less than once in 10 years). By clearly defining these categories, qualitative
assessments become more repeatable. Still, they remain coarse estimates.
Quantitative risk assessment attempts to
assign numeric values to both likelihood and impact, enabling the
calculation of concrete financial risk figures. This approach relies on data:
historical incident rates, statistical models, and asset valuations. The
result is often expressed in monetary terms, which can be very powerful for
cost-benefit analysis and communicating with executives in financial language.
The classic quantitative risk analysis
methodology comes from the field of insurance and can be broken down into a few
key metrics and formulas:
·
Asset Value (AV): The monetary value of the asset at risk. This could be the
replacement cost of a piece of hardware, the assessed value of data or
intellectual property, or any quantifiable value measure. For example, if we
have a data center, we might determine that building a similar facility from
scratch would cost $20 million; that figure would be our asset value for the
data center.
·
Exposure Factor (EF): The proportion of the asset value that would be lost if a
particular risk event occurs. EF is expressed as a percentage of damage.
Different threats can have different exposure factors for the same asset. For
instance, we might estimate that a major flood could destroy 50% of the
data center’s equipment (EF = 0.5 or 50% damage), whereas a minor flood might
only damage 10%. If a threat would likely destroy an asset completely, EF could
be 100%. In our data center example, for a severe flood scenario we set EF =
50%.
·
Single Loss Expectancy
(SLE): This is the expected monetary loss if the
risk event occurs once. It is calculated as:
SLE
= Asset Value × Exposure Factor
Using our numbers: AV = $20 million (data
center), EF = 50% (flood damage). The SLE for a flood at the data center would
be $20,000,000 × 0.5 = $10 million. In other words, a single flood
incident is expected to cause $10M in damage. This
represents the impact in financial terms for one occurrence of that
risk.
·
Annualized Rate of
Occurrence (ARO): This is the estimated frequency
with which we expect the risk event to occur, expressed on a yearly basis. An
ARO of 1.0 means once per year on average; 0.5 would mean once every two years;
0.01 means once every 100 years, and so on. Determining ARO often involves
historical data or industry statistics. In our example, we might consult
meteorological data (such as FEMA flood maps) to find the probability of a
severe flood in the area. Suppose it’s a 1% chance per year (a "100-year
floodplain"). That corresponds to an ARO of 0.01 for the flood risk.
·
Annualized Loss Expectancy
(ALE): This is the key result of quantitative risk
analysis – the expected monetary loss per year from a given risk. ALE is
calculated by multiplying SLE by ARO:
ALE
= SLE × ARO
Continuing our example: SLE = $10,000,000,
ARO = 0.01. Thus ALE = $10,000,000 × 0.01 = $100,000 per year.
This means, on average, the organization can expect $100k in losses each
year due to data center flooding. Of course, in reality the flood will not
happen every year – what this says is that over a long period (say 100 years)
you’d expect one $10M incident, which averages out to $100k per year. ALE
provides a way to annualize risk for budgeting and decision-making
purposes.
To summarize the formulas:
|
Metric
|
Meaning
|
Formula
|
|
Asset Value (AV)
|
The monetary value of the asset at risk
|
The current value in euros or dollars (e.g.
30$)
|
|
Exposure Factor (EF)
|
Percentage of asset value lost if risk
occurs
|
(Estimated as a percentage, e.g. 50%)
|
|
Single Loss Expectancy (SLE)
|
Monetary loss for one occurrence of the
risk
|
SLE = Asset Value × EF
|
|
Annualized Rate of Occurrence (ARO)
|
Frequency of occurrence (per year)
|
(Estimated from historical data, e.g. 0.01)
|
|
Annualized Loss Expectancy (ALE)
|
Expected loss per year from the risk
|
ALE = SLE × ARO
|
Exam Tip: Be sure to memorize these formulas (SLE, ARO, ALE) and understand
how to apply them. The CISM exam may present a scenario and ask you to
calculate the ALE or identify the correct value for SLE or ARO. In our example,
knowing that $10M (SLE) and 0.01 (ARO) gives $100k ALE can be an easy point on
the exam if you remember the formula. Also note that ALE is a theoretical
average – not a guarantee of annual loss – which is useful for comparison
and justification of security investments.
Beyond monetary risk calculations,
quantitative analysis often extends to other numeric metrics that inform risk
and continuity planning. In IT operations and disaster recovery contexts, you
should understand the following measures of reliability and resilience:
·
Mean Time to Failure (MTTF): The average time expected until a non-repairable asset
fails. For devices or components that are not repaired upon failure (they are
simply replaced), MTTF indicates reliability. For example, if a particular
model of hard drive has an MTTF of 100,000 hours, that is the average lifespan
– half the drives would fail before that time and half after (by definition of
an average). MTTF is used for planning maintenance and replacements.
·
Mean Time Between Failures
(MTBF): For repairable systems, which can be
fixed and returned to service after a failure, MTBF measures the average time
between one failure and the next. It is conceptually similar to MTTF, but
applies when the item is restored rather than replaced. For instance, if a server
tends to crash and be repaired, an MTBF of 200 days means on average it goes
200 days between incidents. Higher MTBF indicates more reliable systems.
·
Mean Time to Repair (MTTR): This is the average time it takes to repair a system or component
and restore it to operation after a failure. If a system has an MTTR of 4
hours, that means typically it takes 4 hours to get it back online each time it
fails. MTTR is crucial for understanding downtime duration and for
continuity plans (e.g., how long will a service be unavailable when an incident
occurs?).
Using MTBF and MTTR together helps assess
the expected availability of a system. For example, if a system fails on
average every 200 days (MTBF) and takes 4 hours to recover (MTTR), over a year
you can estimate the total downtime and plan accordingly. These metrics also
tie into calculating service availability percentages and making
decisions about redundancy and maintenance.
In summary, quantitative risk assessment
provides hard numbers that can guide cost-benefit decisions. If the ALE of a
risk is $100k, and a proposed control (like building a flood wall) costs $1M, a
manager can compare those figures to decide if the control is economically
justified. Often, organizations will use a combination of qualitative and
quantitative methods – qualitative for broad initial assessment and when
quantitative data is lacking, and quantitative for high-value assets or when
making the business case for specific investments.
Exam Tip: While CISM is a management-oriented exam (and not as
calculation-heavy as some technical exams), you should expect at least a
question or two requiring simple risk calculations (ALE, etc.), or interpreting
what a given ALE implies. Practice doing these calculations quickly. Also
understand the concepts of MTTF/MTBF/MTTR – for example, a question might ask
which metric is most relevant for planning the replacement of a non-repairable
component (answer: MTTF) or how MTBF and MTTR relate to system uptime.
An important facet of risk management is
understanding what you are protecting and how important it is. This is
where information classification comes into play. Organizations use
classification schemes to label data and systems according to their sensitivity
and criticality, which in turn drives the security requirements for handling
and protecting that information. In essence, not all data is equal – losing some pieces of
information could be a minor inconvenience, while losing others could be a
catastrophic event. Classification helps set the level of protection
proportionate to the value or impact of loss of the asset.
Classification policies define categories
or levels of sensitivity. Each level in the scheme has associated handling
standards (who can access it, how it must be stored, whether it needs
encryption, etc.). While each organization’s scheme can differ, they typically
map to the concept of high, medium, or low sensitivity information.
For example, many government agencies use the classic hierarchy: Unclassified,
Confidential, Secret, Top Secret, where Top Secret information could cause
grave damage if disclosed, and Unclassified is essentially public information.
Private sector businesses often use analogous categories with different labels,
such as Public, Internal, Sensitive, Highly Sensitive, etc., to classify
their proprietary and customer data.
For instance, consider a possible mapping
between government and corporate classification levels:
|
Government Classification
|
Corporate Classification (Example)
|
|
Top Secret –
exceptionally grave damage if leaked
|
Highly Sensitive – critical trade secrets, very sensitive personal data, etc.
|
|
Secret –
serious damage if leaked
|
Sensitive – important proprietary data, internal
strategic documents
|
|
Confidential
– damage but less severe
|
Internal –
internal-use-only information, not for public or customers
|
|
Unclassified
– little to no damage (public)
|
Public –
information approved for anyone, no harm in disclosure
|
The exact names and number of levels can
vary. The key point is that classified information must be handled according
to its level. For example, a company might mandate that any data labeled Highly
Sensitive must be encrypted in transit and at rest, stored only on approved
secure servers, and accessible only by a need-to-know list of employees.
Less sensitive data might not require encryption or might be allowed on public
cloud storage, etc. The classification triggers appropriate controls.
Additionally, organizations will often label data (both digital and
physical) to indicate its classification – e.g., emails might have a header
like “Internal – Company Confidential” or documents stamped “Proprietary” – so
that users are aware of handling requirements.
Certain types of data carry legal or
regulatory implications, and these often warrant a high classification. For
example, personally identifiable information (PII) about customers, financial
records (like credit card numbers), and health records (subject to
laws like HIPAA) are often treated as highly sensitive regardless of internal
value, because their compromise triggers regulatory penalties and reputational
damage. Thus, an organization’s classification policy should consider not
just the impact to the organization, but also impact to individuals whose data
is compromised. Protection of customer data and privacy information is a
critical part of risk management today.
Implementing a classification scheme can be
challenging. It typically starts with a thorough inventory of information
assets – identifying what data exists and where – which can be labor
intensive. But the payoff is a structured understanding of where the crown
jewels are, so to speak, enabling focused security controls on those areas.
Classification is foundational: it feeds into risk assessment (by
identifying which assets are high-value) and into control selection (by
specifying baseline controls for each level). In fact, in formal risk
management frameworks like NIST, categorizing information and systems is
Step 1 of the process. We will see this again when discussing the NIST Risk
Management Framework.
Exam Tip: CISM may test your understanding of data classification levels and
their implications. Know examples of classification labels (government vs
corporate), and remember that higher classification = stricter controls (e.g.,
Top Secret requires more safeguards than Unclassified). A common question theme
is scenario-based: e.g., “What is the FIRST thing to do when developing an
information security program?” – a correct answer could be “Identify and
classify information assets” because without knowing what is most critical, you
can’t effectively prioritize risks or controls.
After completing a risk assessment, you
will have a list of identified risks with their assessed likelihoods and
impacts. The next challenge is deciding how to address each risk. This
process is known as risk treatment or risk response. For any
given risk, there are four general strategies an organization can choose from:
1. Risk Avoidance: Avoidance means eliminating
the risk entirely by ceasing the activities that create the risk. In
practice, this often involves changing business plans or processes so that the
risky situation is no longer encountered. For example, if an organization’s
data center is in a flood zone and faces high flood risk, an avoidance strategy
would be relocating the data center to a place with no flood hazard.
By doing so, the risk of flood damage is removed (avoided). Avoidance is a very
effective strategy in terms of risk elimination, but it can come at the cost of
giving up certain opportunities or benefits (in this case, perhaps the
convenience or low cost of the original location). Organizations should
consider avoidance when a risk is too dangerous or costly to mitigate by other
means and if the activity causing the risk is not mission-critical.
2. Risk Transference (Risk Sharing):
Transference means shifting the impact of the risk to a third party. The
most common form is purchasing insurance. When you buy
insurance (cyber insurance, property insurance, etc.), you are transferring the
financial impact of certain losses to the insurer – if the bad event occurs,
the insurance company pays the bill (up to a limit), not you. Another example
is outsourcing: if a company outsources a service, some risks associated with
that service (and its security) might be transferred contractually to the
vendor. However, it is important to note that not all aspects of risk can be
transferred. Using the data center flood example, you could purchase flood
insurance to cover the financial losses of equipment damage,
but you cannot transfer the reputational damage or operational
downtime easily – those residual impacts still affect your organization.
Transference is a useful strategy for risks that can be clearly defined and
priced (hence insurable), or where specialized third parties can manage the
risk more effectively.
3. Risk Mitigation: Mitigation (or risk
reduction) involves taking active steps to reduce the likelihood and/or
impact of the risk. This is the heart of most cybersecurity efforts –
implementing controls and countermeasures to treat the risk. For
example, to mitigate the flood risk to the data center, the company might
invest in flood control measures: installing water diversion systems, pumps,
raised barriers, etc., to reduce the chance that flood waters reach critical
equipment. In cybersecurity, nearly all security controls (firewalls,
antivirus, encryption, backups, etc.) are risk mitigations – they don’t remove
the threat and might not fix every vulnerability, but they lower the
risk to an acceptable level by making incidents less likely or less damaging.
Mitigation is the most commonly chosen approach for a majority of identified
risks because it allows business to continue while improving safety.
4. Risk Acceptance: Acceptance means acknowledging
the risk and choosing to take no special action to address it, apart from
monitoring. This might sound counterintuitive – why would you ever accept a
risk? In reality, organizations face hundreds of risks, and it is not
feasible to avoid, transfer, or mitigate all of them.
Some risks will be deemed low enough (in likelihood or impact) that the cost or
effort of treating them outweighs the potential damage. For instance, after
considering various options, the company might decide that the flood risk
(especially if low probability) is something they will simply live with –
perhaps all other options (moving the data center, buying insurance, installing
flood controls) are too expensive or impractical, so they accept the
risk and will deal with a flood if and when it happens. Risk
acceptance should be a conscious, documented decision, ideally made by
senior management, not an oversight. It’s essentially saying “we can tolerate
this risk at its current level.” It’s important that accepted risks are
monitored in case their status changes (for example, if what was once a low
risk becomes more likely or more impactful, it may no longer be acceptable).
Every risk must be dealt with using one or
a combination of these strategies. In some cases, multiple strategies apply –
for example, an organization might mitigate most of a risk and then insure
(transfer) the residual impact. Or it might avoid part of a risk and accept the
rest. The combination of all risks an organization faces is often called its risk
profile. Management’s job is to choose an appropriate mix of responses so
that the overall risk profile is in line with the organization’s objectives and
capabilities.
Two important terms related to choosing
risk responses are inherent risk and residual risk. Inherent
risk is the level of risk that exists before any controls or
treatments are applied – essentially the raw, unmitigated risk. Residual
risk is the level of risk that remains after controls are
implemented. Ideally, your mitigation efforts significantly reduce a high
inherent risk down to a lower residual risk. For example, inherently a data
center in a floodplain has a high risk of flood damage. If you install flood
gates and pumps (mitigations), the residual risk might drop to moderate. There
will almost always be some residual risk, because it's rare to eliminate a risk
entirely short of avoiding it altogether.
One more concept: introducing new controls
can sometimes create new risks of their own – this is known as control risk.
For instance, adding a firewall mitigates many network threats, but it
introduces the risk that the firewall could fail or even malfunction and
block legitimate traffic. Similarly, complexity from many controls might
introduce system bugs or administrative mistakes. These control-induced risks
must be considered as part of the analysis. The goal of risk management
is to ensure that residual risk + control risk remains within the
organization’s tolerance.
Speaking of tolerance, organizations
determine how much risk they are willing to accept – this is referred to as risk
appetite. Senior leadership and the board will set the overall risk
appetite: for example, a company might decide it is comfortable with low to
moderate risks in most areas but has zero tolerance for risks that could
endanger human life or violate laws. Risk appetite guides decisions on which
risks to mitigate and how much to spend on controls. If the residual risk of
some activity exceeds the risk appetite (meaning it's too high for comfort even
after mitigations), then additional controls or different strategies (like
avoidance) should be pursued until risk is reduced to acceptable levels.
Exam Tip: Be prepared to identify examples of each risk treatment strategy. A
classic exam question might describe a scenario: e.g., “Due to frequent power
outages, a company decides to invest in backup generators for its data center.”
This is an example of risk mitigation (installing a control to reduce
impact). Or “A company stops offering a certain product because it was leading
to unacceptable legal risks” – that’s risk avoidance. Also remember that
acceptance is a valid strategy – sometimes the best decision is to do
nothing special, as long as it’s an informed decision. CISM expects managers to
know that accepted risks should be documented and approved at the right level
of management.
Once risk treatment decisions are made
(especially decisions to mitigate), the next step is to select and implement
appropriate security controls. Security controls (also called
countermeasures or safeguards) are the measures taken to modify risk –
typically by protecting assets or reducing the likelihood/impact of incidents.
As a security manager, a large portion of your job involves designing, implementing,
and overseeing these controls.
It’s useful to think of security controls
in everyday terms first. Consider how you secure your home: you likely have locks
on doors and windows to prevent intrusions, maybe an alarm system to
detect break-ins, security cameras to record events, perhaps automatic
lights to deter criminals by simulating occupancy, and even policies like
asking a neighbor to check your mail when you’re on vacation.
Each of these is a control addressing a certain risk (burglary in this case) in
a certain way. Some controls overlap in purpose – for example, both the alarm
and the cameras are aimed at detecting intruders. You might
intentionally have multiple controls for the same risk as a safety net in case
one fails – if the alarm doesn’t go off, the cameras might still catch the
thief. In security parlance, this is known as defense in depth:
implementing multiple layers of controls so that if one layer fails, others
still protect the asset.
When managing enterprise security, we
categorize controls in a couple of different and complementary ways.
Understanding these categories is important both for design (to ensure you have
a balanced security program) and for exam purposes (CISM may ask about types of
controls and their characteristics).
This classification is based on what the
control is intended to do in the risk management lifecycle. Common
functional categories include:
·
Preventive Controls: These are designed to stop an incident from occurring in the
first place. They act before a threat can actually impact an asset.
Examples: a firewall blocking unauthorized network traffic is a preventive
technical control that stops attacks at the network border;
door locks and badges prevent unauthorized physical entry (a preventive
physical control); security policies and training can be preventive
administrative controls by discouraging unsafe behaviors. Essentially, anything
that reduces the likelihood of a security breach upfront is preventive.
·
Detective Controls: These aim to identify or discover incidents (or signs of an
imminent incident) so that you can respond. They come into play during or
after an incident, when prevention has not been fully successful. Examples:
an intrusion detection system (IDS) that generates an alert upon suspicious
network activity is detective; security cameras or motion sensors detect physical intrusions; log
monitoring systems and audits detect irregularities or malicious activity in
systems. Detective controls do not stop an incident by themselves, but they are
crucial for awareness – you cannot respond to what you don’t know about.
·
Corrective Controls: These are designed to limit damage and restore systems after
an incident has occurred. They minimize impact (assuming preventive
controls were bypassed and an incident happened). Examples: data backups are a
corrective control – if ransomware encrypts your files, you restore from backup
to recover; a patch management process is corrective when it removes vulnerabilities
(fixing the condition that allowed an incident); incident response procedures
themselves are corrective actions to contain and eradicate a threat. A fire
extinguisher is a non-digital example of a corrective control (putting out a
fire to minimize damage).
·
Deterrent Controls: (Sometimes listed separately) These are controls that discourage
attackers by making the effort riskier or less appealing. They overlap with
preventive in effect, but their main function is psychological. Examples:
Security cameras and warning signs can act as deterrents (even if they also
have a detective function); a prominently displayed legal banner on a system
warning of prosecution might deter casual malicious behavior. Deterrents often
complement other controls.
·
Compensating Controls: (Special category) These are alternative controls that provide
equivalent protection when the primary recommended control is not feasible.
For instance, if a system cannot support encryption (primary control), you
might compensate with extra network segregation and monitoring to achieve an
equivalent risk reduction. Compensating controls don’t neatly fit in
prevent/detect/correct – they are basically substitute controls.
Most discussions focus on Preventive,
Detective, and Corrective as the main three functions (with deterrent sometimes
considered a subset of preventive, and compensating being a design choice when
needed). A strong security program uses a blend of all three: you want
to prevent what you can, detect the things you couldn’t prevent, and correct
the issues that are detected – all in layers.
This classification is based on how
the control is implemented or what form it takes:
·
Technical Controls (Logical
Controls): These are controls implemented through
technology and systems (hardware, software, or firmware). They operate within
IT systems. Examples: encryption of data, access control mechanisms in
software, firewalls, antivirus software, intrusion prevention systems,
multi-factor authentication – all are technical controls.
They enforce security through technical means with minimal human intervention
in operation.
·
Operational Controls (Procedural
Controls): These are processes and procedures
carried out by people (often IT or security staff, but sometimes end-users or
managers) to maintain security. They often support technical controls.
Examples: conducting regular log reviews, performing background checks on new
hires, monitoring CCTV feeds, incident response drills, user security awareness
training, change management processes. These activities require human
execution and oversight. Sometimes physical security measures (guards, facility
procedures) are lumped into operational controls as well, since they are about
day-to-day operations.
·
Managerial Controls
(Administrative Controls): These are high-level governance
and policy oriented controls, usually documented in plans, policies, and
procedures that guide the organizational approach to security. They set the framework
and oversight for other controls. Examples: risk assessment processes (yes,
performing a risk assessment is itself a security control of managerial type),
security policy documentation, vendor assessment procedures, security
architecture reviews, change control boards, audit committees, etc. Managerial
controls ensure that security is designed and managed properly throughout the
organization.
·
Physical Controls: (Often considered a subset of technical or operational, but worth
noting separately) These are controls that physically restrict or protect
access to information or resources. Examples: locks, fences, security guards,
badge access systems, video surveillance, fire suppression systems, climate
controls to protect hardware, etc. Physical controls usually work in tandem
with technical measures to secure the actual facilities and hardware.

Figure: The figure categorizes cybersecurity
controls into physical, technical, and administrative types, each serving
different functions: preventive, detective, and corrective. Preventive controls
aim to stop incidents before they occur, such as gates and firewalls. Detective
controls are designed to identify and monitor incidents, like CCTV systems or
audit logs. Corrective controls focus on responding to and recovering from
incidents, for example by patching systems or implementing an incident response
plan. This structured approach helps organizations address threats across
multiple layers of defense.
In the literature, you may see the triad administrative,
technical, physical as categories – administrative corresponds to our managerial/operational
policies; technical to logical controls; physical remains physical.
The NIST approach mentioned in the content above groups into technical,
operational, and management, implicitly covering physical under operational.
It’s important to have a mix of these
implementation categories. For example, you might address the risk of
unauthorized data access with technical controls (access control lists,
encryption), operational controls (regular permission reviews by admins,
training users on data handling), physical controls (locked server
room), and managerial controls (an information security policy that
defines access management procedures). Together, they form layers of defense.
When selecting controls, you often start
with baseline controls (common safeguards applicable to most systems)
and then tailor them to specific risks identified. Industry standards
like ISO 27001 or NIST SP 800-53 provide catalogs of controls to consider. The
selection must be appropriate to the risk’s magnitude (don’t use a sledgehammer
for a fly, but also don’t bring a knife to a gunfight, as the sayings go).
Cost-benefit analysis is part of this – you aim for controls where the benefit
(risk reduction) justifies the cost, and that collectively bring risk down to
acceptable levels.
Exam Tip: Be familiar with examples of control types. A question might ask
something like, “What type of control is a security awareness training
program?” The answer: it’s an operational (administrative) control and
specifically a preventive one (it seeks to prevent incidents by
educating users). Or, “Which of the following is a detective technical
control?” – an example answer: an Intrusion Detection System or audit log
monitoring. Also, the exam might test the concept of defense in depth –
you should recognize that using multiple overlapping controls (like the door
lock + alarm + camera analogy) is a best practice to compensate for any single
control’s failure. One more: differentiate between technical and operational by
remembering operational controls are performed by people, whereas technical
controls are performed by systems. If a question describes an
administrator reviewing logs, that’s operational; if it describes a system
enforcing access rules, that’s technical.
Once implemented, controls need to be
assessed for proper function. Even the best control on paper can fail if
misconfigured. Two terms often come up regarding control efficacy: false
positives and false negatives. A false positive occurs when a
control triggers an alert or action when it shouldn’t – a benign
activity is mistaken as malicious. For instance, an intrusion detection system
that raises an alarm for normal network traffic is generating a false positive.
False positives can lead to wasted effort and “alarm fatigue,” where admins
might start ignoring alerts due to frequent bogus alarms. A false
negative is the opposite: the control fails to trigger when it should,
missing a real attack or incident. Using the IDS example, if a real
intrusion happens but the IDS does not detect it, that is a false negative –
far more dangerous because it gives a false sense of security.
When tuning controls (like IDS rules, spam filters, etc.), there’s often a
trade-off between false positives and false negatives; careful calibration is
needed to minimize both.
In practice, after controls are in place,
organizations conduct control assessments (which we’ll cover next) to
ensure that controls are implemented correctly, operating as intended, and
fulfilling their purpose. This is a continuous effort – security controls
require monitoring and maintenance. For example, a firewall rule base might need
periodic review, or user access permissions need to be re-certified regularly
(an operational control to ensure the technical access control is still aligned
with who should have access).
. . .